153   Fire safety certificates: section 109H
(cf clause 79N of EP&A Regulation 1994)
(1)  In the case of a final occupation certificate to authorise a person:
(a)  to commence occupation or use of a new building, or
(b)  to commence a change of building use for an existing building,
a certifying authority must be satisfied that a final fire safety certificate has been issued for the building.
(1A)  If the need for the final occupation certificate arises solely from fire link conversion, the final fire safety certificate referred to in subclause (1) need only deal with the new fire alarm communication link.
(2)  In the case of an interim occupation certificate to authorise a person:
(a)  to commence occupation or use of a partially completed new building, or
(b)  to commence a change of building use for part of an existing building,
a certifying authority must be satisfied that a final fire safety certificate or an interim fire safety certificate has been issued for the relevant part of the building.
(3)  This clause does not apply to a class 1a or class 10 building within the meaning of clause 167.
(4)  In this clause:
interim fire safety certificate has the same meaning as it has in Part 9.
final fire safety certificate has the same meaning as it has in Part 9.