1 Name of plan
2 Nature and status of this Plan
3 Date of commencement
4 Water source and waters to which this Plan applies
5 Interpretation
6 Effect on licences, authorities and permits under the Water Act 1912
7 State Water Management Outcomes Plan
Part 2 Vision, objectives, strategies and performance indicators
8 Vision, objectives, strategies and performance indicators
9 Vision
10 Objectives
11 Strategies
12 Performance indicators
Part 3 Environmental water provisions
13 Environmental water provisions
14 Planned environmental water
15 Planned environmental water
16 Adaptive environmental water
Part 4 Basic landholder rights
17 Basic landholder rights
18 Domestic and stock rights
18A Harvestable rights
19 Native title rights
20 Bulk access regime
Part 6 Requirements for water under access licences
21 Requirements for water under access licences
22 Share component for domestic and stock access licences
23 Share component for local water utility access licences
24 Share component for regulated river (high security) access licences
25 Share component for regulated river (general security) access licences
26 Share component for Murrumbidgee Irrigation (conveyance) access licence
27 Share component for Coleambally Irrigation (conveyance) access licence
28 Share component for supplementary water access licences
28A Share component for supplementary water (Lowbidgee) access licences
29 Changes to total share component
Part 7 Rules for granting access licences
30 Rules for granting access licences
Part 8 Limits to the availability of water
Division 1 Long-term average annual extraction limit
31 Limits to the availability of water
32 Volume of the long-term average annual extraction limit for Murrumbidgee extractions
32A Volume of the long-term average annual extraction limit for Lowbidgee extractions
33 Assessment of the long-term average annual extraction limit and current level of long-term average annual Murrumbidgee extractions
34 Compliance with the long-term average annual extraction limit for Murrumbidgee extractions
34A Calculation of the long-term average annual extraction limit and current levels of annual Lowbidgee extractions
34B Assessment of average annual extraction against the long-term annual extraction limit for Lowbidgee extractions
34C Compliance with the long-term average annual extraction limit for Lowbidgee extractions
Division 2 Available water determinations
35 Available water determinations
36 Available water determinations for domestic and stock access licences
37 Available water determinations for local water utility access licences
38 Available water determinations for regulated river (high security) access licences
39 Available water determinations for regulated river (general security) access licences
40 Available water determinations for Murrumbidgee Irrigation (conveyance) access licences
41 Available water determinations for Coleambally Irrigation (conveyance) access licences
42 Available water determinations for supplementary water access licences
42A Available water determinations for supplementary water (Lowbidgee) access licences
Part 9 Rules for managing access licences and water supply works
43 Rules for managing access licences and water supply works
Division 1 Water allocation account management
44 Water allocation accounts
45 Accrual of water allocations
46 Volume taken under access licences
47 Accounting of assigned water allocations and return flows
48 Account forfeits/limits/carryover
Division 2 Extraction conditions
49 General priority of extractions
50 Numerical specification of extraction components
51 Extraction of water under supplementary water access licences and supplementary water (Lowbidgee) access licences
51A Distribution rules for the Lowbidgee area
Part 10 Access licence dealing rules
52 Access licence dealing rules
53 Rules relating to constraints within a water source
53A Rules relating to dealing constraints within the Yanco system
54 Rules for change of water source
55 Rules for conversion of access licence category
56 Rules for interstate access licence transfer
57 Rules for water allocation assignment between water sources
58 Rules for interstate assignment of water allocations
59 Mandatory conditions on access licences
60 Mandatory conditions on water supply works approvals
Part 12 System operation rules
61 System operation rules
62 Provisional storage volume
63 (Repealed)
64 Minimum flow levels
65 Channel capacity constraints
66 Rates of change to storage releases
67 Flood operation rules
68 Airspace operation rules
69 (Repealed)
Part 13 Monitoring and reporting
70 Monitoring
Part 14 Amendment of this Plan
71 Changes to this water source
72 Review of environmental water and provisional storage volume rules
73 Review of access rules for supplementary water access licences and supplementary water (Lowbidgee) access licences
74 Other amendments of this Plan
75 Amendment relating to planned environmental water
76 Amendment of Plan relating to floodplain harvesting
Schedule 2 Contribution to targets in the State Water Management Outcomes Plan
Schedule 3 Goodradigbee flow classification table
Schedule 4 Burrinjuck Dam translucency percentage table
Schedule 5 Initial “unclipped” translucency percentage table
Appendix 1 Overview of the Plan Map
Appendix 2 Inspection of Plan Map