Part 1 Introduction
1 Name of Plan
This Plan is the Water Sharing Plan for the Coopers Creek Water
Source 2003 (hereafter this Plan).
2 Nature and status of this Plan
(1) This Plan is made under section 50 of the Water Management Act 2000 as amended
(hereafter the
Act).
(2) This Plan covers the core provisions of section 20 of the Act for
water sharing, and additional provisions of section 21 of the Act, and other
relevant matters.
3 Date of commencement
This Plan takes effect on 1 July 2004 and ceases 10 years after
that date.
4 Area to which this Plan applies
(1) The area in respect of which this Plan is made is that area of
land within the Northern Rivers Water Management Area known as the Coopers
Creek Water Source (hereafter this water source) as
shown on the map in Schedule 2.Note. The Northern Rivers Water Management Area is as shown on the map
in Appendix 1.
Note. Maps referred to in this Plan may be inspected at offices of the
Department of Water and Energy listed in Appendix 2.
(2) This water source is divided into the following management zones
as shown on the map in Schedule 2:(a) Upper Coopers Creek Management Zone, being all creeks and rivers
flowing into and including Coopers Creek upstream of the junction of Bennys
Creek and Coopers Creek, excluding Bennys Creek, and
(b) Lower Coopers Creek Management Zone, being all creeks and rivers
flowing into and including Coopers Creek from the junction of Bennys Creek and
Coopers Creek to the downstream end of this water source, including Bennys
Creek.
Note. This water source has been divided into two management zones in
order to separate the areas of high instream value (the Upper Coopers Creek
Management Zone) from the area containing the greatest concentration of
economic production assets (the Lower Coopers Creek Management Zone), which in
turn allows more flexible water sharing rules to be
established.
5 Waters to which this Plan applies
(1) The waters of this water source include all water occurring on the
land surface shown on the map in Schedule 2 including, but not limited
to:(a) all rivers in this water source including those nominated in
Schedule 3, and
(b) all lakes and wetlands in this water
source.
(2) The waters of this water source exclude all water contained within
aquifers underlying this water source.
6 Interpretation
(1) Terms that are defined in the Act have the same meaning in this
Plan and the effect of these terms may be explained in
Notes.
(2) Additional terms to those identified in subclause (1) are defined
in Schedule 1.
(3) Notes in the text of this Plan do not form part of this
Plan.
(4) Schedules to this Plan form part of this
Plan.
(5) Appendices to this Plan do not form part of this
Plan.
7 Effect on licences, authorities and permits under the
Water Act 1912
(1) This Plan applies from commencement to those matters that are
administered under the Act at that time.
(2) This Plan applies to other matters from the date the relevant
provisions of the Act are commenced.
Note. To the extent possible, the rules embodied in this Plan will apply
to matters administered under the Water Act
1912 in the interim.
8 (Repealed)
Part 2 Vision, objectives, strategies and performance
indicators
9 Vision, objectives, strategies and performance
indicators
This Part is made in accordance with section 35 (1) of the
Act.
10 Vision
The vision for this Plan is for the environment of the Coopers
Creek Water Source to receive the necessary water to sustain healthy
functioning ecosystems and provide flows to downstream sub-catchments, and
that an informed, water efficient community is provided with water to meet its
needs.
11 Objectives
The objectives of this Plan are to:(a) provide opportunities for access to water in this water source for
domestic and stock purposes while encouraging and supporting efficient,
innovative water use, alternative water sources and drought management
strategies,
(b) ensure Aboriginal cultural needs are considered in flow management
decisions for this water source, to enable maintenance and protection of
values and places of importance under traditional laws, customs and
practices,
(c) protect the variability of natural flow conditions thereby
maintaining and improving the overall health of this water source and related
ecosystems, including threatened species,
(d) preserve and maintain the functions of natural low flows in
Coopers Creek and its tributaries, particularly during dry
periods,
(e) protect very low flows for fundamental ecosystem health and pools
for drought refuge,
(f) provide flows that facilitate passage of the Eastern Freshwater
Cod,
(g) recognise and seek to protect existing industry via trading rules
and access rules that provide opportunities for continued
access,
(h) provide opportunities for access to water for irrigation and other
commercial purposes in this water source,
(i) enhance the health of the Wilsons River and the Richmond estuary
by ensuring adequate downstream flow contributions from this water source,
and
(j) protect and improve water quality in this water source through the
management of flows.Note. This objective refers to maintaining water quality. Although there
are no specific strategies directly related to this objective in this Plan,
the environmental water provisions in this Plan make a positive contribution
to maintaining water quality.
12 Strategies
The strategies of this Plan are to:(a) establish cease (and commence) to pump levels and flow
classes,
(b) limit the amount of water that can be extracted on a daily basis
from different flow classes,
(c) limit the long-term average extraction of
water,
(d) clearly define access rules and conditions for extracting water
from this water source,
(e) establish rules for determining the water available from time to
time under access licences,
(f) establish water allocation accounting rules,
and
(g) specify access licence dealing rules that maximise flexibility for
water users without adversely impacting on this water
source.
13 Performance indicators
The following indicators are to be used to determine the
performance of this Plan against its objectives:(a) change in low flows,
(b) change in moderate to high flows,
(c) change in ecological condition of this water source and dependent
ecosystems,
(d) extent to which basic landholder rights requirements have been
met,
(e) change in economic benefits derived from water extraction and
use,
(f) extent to which native title rights requirements have been
met,
(g) extent of recognition of spiritual, social and customary values of
water to Aboriginal people, and
(h) (Repealed)
Note. Appendix 3 details the objectives to which these performance
indicators relate and the methods for assessing these
indicators.
Part 3 Basis for water sharing
14 Basis for water sharing
This Part is made in order to give effect to section 5 (3) of the
Act, and in accordance with sections 20 (2) (c) and 21 (e) of the
Act.
15 Climatic variability
(1) This Plan recognises climatic variability and therefore river flow
variability in this water source.
(2) To give effect to subclause (1), this Plan has provisions that
manage:(a) the sharing of water in this water source within the limits of
water availability on a long-term average basis, and
(b) sharing of the flows that occur in this water source on a daily
basis.
16 Extraction management unit
(1) The availability of water for extraction from this water source on
a long-term average basis will be determined at the level of an extraction
management unit.
(2) The extraction management unit of which this water source is part
is known as the Richmond River Extraction Management Unit, and is shown on the
map in Schedule 6.
17 Flow classes
(1) This Plan establishes the following flow classes as the basis for
sharing of daily flows in the Upper Coopers Creek Management Zone:(a) the Very Low Flow Class is when flows are less than 12.5
megalitres per day (hereafter ML/day),
(b) A Class is when flows are at or greater than 12.5 ML/day and at or
less than 31 ML/day,
(c) B Class is when flows are greater than 31 ML/day and at or less
than 96 ML/day,
(d) C Class is when flows are greater than 96 ML/day and at or less
than 264 ML/day, and
(e) D Class is when flows are greater than 264
ML/day.
Note. The flow classes have been determined based on flow information
and hydrological modelling that inherently includes seasonal effects as well
as evaporation and seepage losses.
(2) This Plan establishes the following flow classes as the basis for
sharing of daily flows in the Lower Coopers Creek Management Zone:(a) the Very Low Flow Class is when flows are less than 12.5
megalitres per day (hereafter ML/day),
(b) A Class is when flows are at or greater than 12.5 ML/day and at or
less than 31 ML/day,
(c) B Class is when flows are greater than 31 ML/day and at or less
than 96 ML/day,
(d) C Class is when flows are greater than 96 ML/day and at or less
than 264 ML/day, and
(e) D Class is when flows are greater than 264
ML/day.
(3) Notwithstanding subclauses (1) and (2), A Class, B Class and C
Class will only be applied if, in the opinion of the Minister, they are
required to better manage the sharing of water between water users and the
environment in one or both management zones and the Minister has made a
determination under clause 19.
(4) Subclauses (1) and (2) may be amended if the Minister is of the
opinion that the Very Low Flow Class is having a significant economic impact
on water users subject to the Very Low Flow Class not being reduced to a flow
that is less than 8.5 ML/day.
(5) Subclauses (1) and (2) may be amended if following a review of any
new flow information that becomes available, the Minister is of the opinion
that the Very Low Flow Class does not provide adequate Planned Environmental
Water.
(6) Before amending subclauses (1) and (2) the Minister should consult
with representatives of the Coopers Creek Water Users
Group.
18 Flow reference point
For the purpose of this Plan, all flows referred to relate to
Coopers Creek at Ewing Bridge, as shown on the map in Schedule
2.
19 Determination of flow class
In accordance with clause 17 (2), the Minister may from time to
time, make a determination that A Class, B Class and C Class will be applied
in one or both management zones, if, in the opinion of the Minister, they are
required to better manage the sharing of water between water users and the
environment.
Part 4 Environmental water provisions
20 Environmental water provisions
This Part is made in accordance with sections 5 (3) and 8 (1), 8
(2) and 20 (1) (a) of the Act.
21 Planned Environmental Water
(1) Planned environmental water is identified and established in this
water source as follows:(a) when flows are less than 12.5 ML/day, then planned environmental
water is the flow occurring in this water source minus 0.05 ML/day and minus
the Very Low Flow Class access permitted under clause 63 of this
Plan,Note. 0.05 ML/day is the amount of water estimated at the commencement
of this Plan for basic landholder rights in this water
source.
(b) if A Class has been determined by the Minister in both management
zones, then planned environmental water is the flow occurring in this water
source minus 18.12 ML/day,Note. 18.12 ML/day is the amount of water estimated at the commencement
of this Plan for A Class total daily extraction limit and basic landholder
rights in this water source.
(c) if B Class has been determined by the Minister in both management
zones, then planned environmental water is the flow occurring in this water
source minus 58.12 ML/day,Note. 58.12 ML/day is the amount of water estimated at the commencement
of this Plan for B Class total daily extraction limit and basic landholder
rights in this water source.
(d) if C Class has been determined by the Minister in both management
zones, then planned environmental water is the flow occurring in this water
source minus 60.12 ML/day,Note. 60.12 ML/day is the amount of water estimated at the commencement
of this Plan for C Class total daily extraction limit and basic landholder
rights in this water source.
(e) if A Class, B Class or C Class has not been determined by the
Minister in both management zones, then planned environmental water is the
flow occurring in this water source minus any water taken pursuant to basic
landholder rights and access licences, and
(f) the flow occurring in this water source in the 48 hour period
after flows have risen from the Very Low Flow Class to more than 31 ML/day
within a 24 hour period, minus basic landholder rights extractions and minus
extractions by licence holders specified in Schedule
4.
(2) Planned environmental water is maintained as follows:(a) in the Very Low Flow Class:(i) the holders of access licences, excluding access licences listed
in Schedule 4, are not permitted to take water,
(ii) access licence holders listed on Schedule 4 may take water in the
Very Low Flow Class in accordance with clause 63, and
(iii) persons exercising native title and domestic and stock basic
landholder rights may take water up to a combined total of 0.05
ML/day,
Note. The Minister may, by order made under section 324 of the Act,
impose temporary water restrictions to direct that, for a specified period,
the taking of water from this water source by persons exercising native title
and domestic and stock basic landholder rights is totally prohibited or is
restricted as specified in the order, when it is necessary to do so in the
public interest (such as to cope with a water shortage or threat to public
health or safety).
Note. The Minister may, by order made under section 331 of the Act,
direct a landholder exercising domestic and stock basic landholder rights to
take specified measures to protect the environment, to preserve basic
landholder rights or to overcome a threat to public
health.
(b) if A Class, B Class or C Class has been determined by the
Minister, then:(i) the holders of access licences other than unregulated river (high
flow) access licences, may take water subject to the restriction specified in
subclause (f) and the total daily extraction limits specified in clause
46,
(ii) persons exercising native title and domestic and stock basic
landholder rights may take water,
(iii) if the water taken by persons exercising native title and domestic
and stock basic landholder rights is assessed to be exceeding 0.05 ML/day in
this flow class, the access to water for access licences will be reduced in
accordance with clause 51, to maintain the planned environmental water in this
flow class, and
(iv) the holders of unregulated river (high flow) access licences are
not permitted to take water,
(c) the holders of unregulated river (high flow) access licences may
only take water when flows are within D Class,
(d) notwithstanding all other rights and conditions, extraction of
water from a river by an approved water supply work is permitted only if there
is visible flow in the river in the vicinity of the work,
(e) limits are imposed on the availability of water, in accordance
with clauses 36 and 38, to protect a proportion of natural river flows for
fundamental ecological needs from increases in long-term water
extraction,
(f) if flows have risen from the Very Low Flow Class to more than 31
ML/day within a 24 hour period, water may not be taken under an access
licence, excluding those access licences listed in Schedule 4, in the 48 hour
period after flows first exceeded 31 ML/day.
Note. These rules protect water for the environment by limiting both the
water extracted over the long term and the rate of extraction of water in
different flow ranges, thereby achieving the objectives of this
Plan.
Note. This Plan recognises that the planned environmental water
provisions provide non-extractive benefits, including traditional Aboriginal
spiritual, social and cultural benefits, and a contribution to improved water
quality.
(3) The Minister may amend clauses 21 (1) and (2) to reflect changes
made to the Very Low Flow Class and A Class thresholds under clause
17.
(4) The Minister may amend clause 21 subject to the limitations in
subclause (5), to include rules which prohibit the taking of water under an
access licence within a specified period of time after flows have fallen below
a specified flow threshold, if future research concludes that such rules would
be beneficial for Cod movement.
(5) Amendments made under subclause (4) shall be subject to:(a) the specified period of time being between 48 and 72 hours,
and
(b) the specified flow threshold being between 60 ML/day and 120
ML/day.
(6) Prior to an amendment made under subclause (4) consideration
should be given to:(a) the latest hydrological information,
(b) the affect of in-stream barriers on Cod
movement,
(c) levels of water extraction and the impacts extraction has on flow
heights,
(d) geomorphic characteristics of the water source so that flow rules
compliment Cod habitat, and
(e) socio-economic impacts associated with the
amendment.
22, 23 (Repealed)
24 Adaptive environmental water
(1) Water may be committed in this water source for environmental
purposes by an adaptive environmental water condition imposed on an access
licence, pursuant to sections 8, 8B, 8C, 8D and 8E of the
Act.
(2) The holder of an access licence may request that the Minister
impose an adaptive environmental water condition in respect of the whole or a
part of the share component of the access licence.
(3) The condition imposed under subclause (2) will continue until the
holder requests its removal in writing, and the condition is revoked by the
Minister, pursuant to section 8B (2) of the Act.
(4) An access licence may be granted in this water source, pursuant to
section 8C of the Act, by the Minister to the Minister, a catchment management
authority or other public body, without the need for an application to be made
for the licence in accordance with Part 2 of Chapter 3 of the Act, so long
as:(a) works or other actions result in water savings in the system being
made in this water source, and
(b) the share component of the access licence is equal to the value of
water savings made in the system, and
(c) an adaptive environmental water condition is imposed on the access
licence and the condition is not removed,
where system means
that part of this water source that is not identified by this Plan for
commitments to basic landholder rights and for sharing and extraction under
any other rights.
(5) The Minister may keep an access licence surrendered by the holder
of the licence or transfer it to a catchment management authority or other
public body, and may change the licence to a different category or
subcategory, if:(a) the licence has been surrendered as a result of water savings made
by any means (for example, works or other improvements or recycling),
and
(b) the share component of the licence is equal to the value of the
savings made, and
(c) an adaptive environmental water condition is imposed on the access
licence and the condition is not removed.
(6) An adaptive environmental water condition is a mandatory condition
and the terms of an adaptive environmental water condition specified in
subclause (1):(a) are to be imposed by the Minister or Minister’s delegate,
and
(b) are to be specified on the access licence, and
(c) shall further the objectives of this
Plan.
(7) The allocation of water for access licences with an adaptive
environmental water condition will be in accordance with the available water
determination made for the relevant category of access licence under this
Plan.
(8) If the adaptive environmental water condition on an access licence
requires the water to be left in this water source for environmental purposes,
then the water allocation account is to be debited when the water is available
in accordance with the adaptive environmental water condition on the access
licence.
(9) If the adaptive environmental water condition requires the
environmental water to be taken from this water source, then the water
allocation account is to be debited when it is
taken.
(10) For the purposes of auditing compliance with the long-term average
extraction limit under this Plan, the delivery of water pursuant to an access
licence with an adaptive environmental water condition:(a) in the case of a licence arising under subclause (4), shall not be
accounted for as extraction where it occurs, and
(b) in the case of a licence arising under subclause (2) or subclause
(5), shall be accounted for as extraction where it
occurs.
(11) To the extent that the water allocation of an access licence which
is subject to an adaptive environmental water condition is not required to
meet the requirement of the adaptive environmental water condition, it may be
the subject of an assignment dealing in accordance with the Dealings Rules in
Part 11 of this Plan.
(12) Notwithstanding subclause (11), an access licence with an adaptive
environmental water condition may be the subject of any other dealing
permitted by the Dealing Rules in this Plan, provided the benefit to the
environment provided for in the adaptive environmental water condition is not
diminished.
(13) At the commencement of this clause, there were no access licences
with an adaptive environmental water condition in this water
source.
Part 5 Basic landholder rights
25 Basic landholder rights
This Part is made in accordance with sections 5 (3) and 20 (1) (b)
of the Act.
26 Domestic and stock rights
(1) At the commencement of this Plan the water requirements of holders
of domestic and stock rights are estimated to be a total of 0.05
ML/day.
(2) This Plan recognises that the exercise of domestic and stock
rights may increase during the term of this Plan.Note. Increase in use of domestic and stock rights may occur as a result
of an increase in the number of landholdings fronting rivers and lakes in this
water source or as a result of an increase of the exercise of basic landholder
rights by existing landholders.
27 Native title rights
(1) At the commencement of this Plan there are no holders of native
title rights and therefore the water requirements for native title rights are
a total of 0 ML/day.
(2) This Plan recognises that the exercise of native title rights may
increase during the term of this Plan.Note. Increase in use of native title rights may occur as a result of
the granting of native title rights under the Commonwealth’s Native Title Act
1993.
28 Harvestable rights
The requirement for water under harvestable rights is the amount
of water owners of land are entitled to capture pursuant to the harvestable
rights Order published in the NSW Government Gazette on 23 March 2001 under
section 54 of the Act.
Part 6 Bulk access regime
29 Bulk access regime
(1) This Part is made in accordance with section 20 (1) (e) of the
Act.
(2) This Plan establishes a bulk access regime for the extraction of
water under access licences in this water source having regard to:(a) the environmental water provisions established under Part 4 of
this Plan,
(b) the requirements for basic landholder rights identified under Part
5 of this Plan, and
(c) the requirements for water for extraction under access licences
identified under Part 7 of this Plan.
(3) The bulk access regime established in subclause (2):(a) recognises the effect of climatic variability on the availability
of water as provided for under Part 3 of this Plan,
(b) establishes rules according to which access licences are granted
as provided for in Part 8 of this Plan,
(c) recognises and is consistent with limits to the availability of
water as provided for in Part 9, Division 1 of this Plan,
(d) establishes rules according to which available water
determinations are to be made as provided for in Part 9 Division 2 of this
Plan,
(e) establishes rules according to which access licences are managed
as provided for in Part 10 of this Plan, and
(f) establishes rules with respect to the priorities according to
which access licences are to be adjusted as a consequence of any reduction in
the availability of water as provided for in Parts 9 and 10 of this
Plan.
Part 7 Requirements for water under access
licences
30 Requirements for water under access licences
This Part is made in accordance with section 20 (1) (c) of the
Act.Note. The amount of water specified in this Part represents the total
volumes specified on access licences in this water source. It is not a
commitment to supply that water.
31 Estimate of water requirements
(1) It is estimated that at the time of commencement of Part 2 of
Chapter 3 of the Act in the area in respect of which this Plan is made, the
requirements identified for water for extraction under access licences within
this water source will total approximately 5,887 megalitres per year
(hereafter ML/yr).
(2) It is estimated that at the time of commencement of Part 2 of
Chapter 3 of the Act in the area in respect of which this Plan is made, there
will be several runoff harvesting access licences in this water source, that
will have their access licence share component expressed as the water that can
be extracted from time to time from the approved
works.
(3) This Plan recognises that the total requirements for water for
extraction within this water source may change during the term of this Plan as
a result of:(a) the granting, surrender, cancellation or non-renewal of access
licences,
(b) variations to local water utility licences arising from sections
66 (3) or 66 (4) of the Act, or
(c) the granting of an application to an existing access licence
holder under the provisions of clause 32 (2) (d), up to a maximum total
additional share components in this water source of 3,000 unit
shares.
Part 8 Rules for granting access licences
32 Rules for granting access licences
(1) This clause is made in accordance with sections 20 (2) (b) having
regard to the limits to water availability in this water source and the need
to protect dependent ecosystems.
(2) In addition to those applications for specific purpose access
licences permitted under clause 19 of the Water Management (General) Regulation
2004 (hereafter the Regulation)
applications may also be made in this water source for:(a) an access licence that may be granted in accordance with a
dealing,
(b) a domestic and stock access licence,
(c) an unregulated river [Aboriginal community development] access
licence where the share component does not exceed 10 ML/year per
applications,Note. An unregulated river [Aboriginal community development] access
licence will not be fully tradeable. Allocations under these licences will be
able to be traded to non-Aboriginal people, however the licence itself can
only be traded amongst Aboriginal people, and as such, will remain in the
Aboriginal community for the life of the licence. These licences will not be
able to be converted to any other category of licence. Aboriginal communities,
enterprises and individuals are encouraged to seek financial assistance from
funding bodies to purchase fully commercial licences.
(d) an unregulated river access licence share component for existing
access licence holders, provided that individual daily extraction limits
(hereafter IDEL) are
surrendered as follows:(i) the access licence share component may increase by 100% if all A
Class IDELs are surrendered,
(ii) the access licence share component may increase by 200% if all A
and B Class IDELs are surrendered,
(iii) IDEL in C Class will not change,
(iv) to be eligible for additional share component under subclause (2)
(d), the IDEL surrendered must be the full IDEL initially assigned to the
access licence, as amended by clause 51,
(v) the share component that is increased in accordance with
subclauses (2) (d) (i) or (ii) cannot exceed the initial share component of
the access licence to which the IDEL was originally
assigned,
(vi) the total daily extraction limit in clauses 46 and 47 will be
reduced by the amount of IDEL surrendered in A and B Class,
and
(vii) the granting of these additional share components may continue as
long as the additional share components for this water source resulting from
subclause (2) (d) do not exceed 3,000 unit shares,
(e) an unregulated river (research) access licence where the share
component does not exceed 10 ML/year per
application.
Note. At 1 July 2008, clause 19 of the Regulation provides that
applications may be made for the following specific purpose access
licences:(i) a local water utility access licence (subcategory “domestic
and commercial”), for the purpose of domestic consumption and commercial
activities,
(ii) a domestic and stock access licence (subcategory
“domestic”), for the purpose of domestic
consumption,
(iii) an unregulated river access licence (subcategory “town water
supply”), for the purpose of supply to communities for domestic
consumption and commercial activities,
(iv) an aquifer access licence (subcategory “town water
supply”), for the purpose of supply to communities for domestic
consumption and commercial activities, and
(v) any category of specific purpose access licence (subcategory
“Aboriginal cultural”), for Aboriginal cultural
purposes.
Section 61 (b) of the Act allows for a person to apply for an
access licence with a zero share component.
Section 61 (c) of the Act allows for a person to apply for an
access licence where the right to apply for that access licence has been
acquired under section 65 of the Act.
Sections 66 (3) of the Act allows the Minister to vary a local
water utility’s share component at 5 year intervals, to reflect any
variation in population, together with any variation in associated commercial
activities that has occurred during the period.
Section 66 (4) of Act allows the Minister to vary a local water
utility’s share component, on application of the local water utility to
reflect any rapid growth of population within the utility’s area
requiring an immediate increase in the availability of water for supply by
that utility.
(3) An access licence of the subcategory (Aboriginal cultural) can
only be granted if the application does not exceed 10
ML/yr.
(4) An application for a specific purpose access licence will only be
granted if the share or extraction component of the access licence is the
minimum required to meet the circumstances in which the access licence is
proposed to be used.
(5) Any IDELs for licences granted in accordance with this clause will
not exceed the IDEL initially assigned to an equivalent share component for
that category of access licence, as varied by clause
51.
(6) Any new access licence granted in this water source in accordance
with this clause, must have a share component within the respective total
daily extraction limit initially assigned.
33 Aboriginal assessment of new access licences
(1) The Minister should seek the views of the Bundjalung Aboriginal
Elders Council and the Ngulingah Aboriginal Land Council in relation to all
dealings under sections 71Q, 71S, 71T and 71W of the Act, and new access
licence applications.
(2) The Minister will consider any advice provided under subclause (1)
before making a determination on an access licence application or dealing
referred to in subclause (1).
(3) In the event of an application for an Aboriginal commercial access
licence, the Minister will seek the views of the Aboriginal Reference Group as
to the benefit derived from the proposed application. Where an Aboriginal
Reference Group has yet to be established, the advice of the Bundjalung
Aboriginal Elders Council and the Ngulingah Aboriginal Land Council will be
sought.
Part 9 Limits to the availability of water
Division 1 Long-term average extraction limit
34 Limits to the availability of water
This Division is made in accordance with section 20 (2) (a) of the
Act.
35 Extraction management unit
Management of the long-term extraction of water in this water
source will be undertaken in the context of the Richmond River Extraction
Management Unit (hereafter this
Unit) referred to in clause 16 (2).
36 Long-term average extraction limit
The long-term average extraction limit for this Unit of which this
water source is a part will be the total of:(a) the share components of access licences in this water source at
the commencement of this Plan, plus
(b) an estimate of annual water requirements pursuant to basic
landholder rights (excluding those exercised via a water bore) in this water
source, plus
(c) the share components of all access licences in the following water
sources at the commencement of the Water Sharing Plan for the Richmond River Area
Unregulated, Regulated and Alluvial Water Sources 2010:(i) Alstonville Area Water Source,
(ii) Bangalow Area Water Source,
(iii) Broadwater Area Water Source,
(iv) Coraki Area Water Source,
(v) Double Duke Area Water Source,
(vi) Doubtful Creek Water Source,
(vii) Eden Creek Water Source,
(viii) Gradys Creek Water Source,
(ix) Kyogle Area Water Source,
(x) Lennox Area Water Source,
(xi) Leycester Creek Water Source,
(xii) Myall Creek Water Source,
(xiii) Myrtle Creek Water Source,
(xiv) Upper Richmond River Water Source,
(xv) Sandy Creek Water Source,
(xvi) Shannon Brook Water Source,
(xvii) Terania Creek Water Source,
(xviii) Toonumbar Area Water Source,
(xix) Tuckean Area Water Source, and
(xx) Wyrallah Area Water Source, and
(xxi) Richmond Regulated Alluvial Water Source,
plus
(d) the estimate of annual water requirements pursuant to basic
landholder rights in the following water sources in the Water Sharing Plan for the
Richmond River Area Unregulated, Regulated and Alluvial Water Sources
2010:(i) Alstonville Area Water Source,
(ii) Bangalow Area Water Source,
(iii) Broadwater Area Water Source,
(iv) Coraki Area Water Source,
(v) Double Duke Area Water Source,
(vi) Doubtful Creek Water Source,
(vii) Eden Creek Water Source,
(viii) Gradys Creek Water Source,
(ix) Kyogle Area Water Source,
(x) Lennox Area Water Source,
(xi) Leycester Creek Water Source,
(xii) Myall Creek Water Source,
(xiii) Myrtle Creek Water Source,
(xiv) Upper Richmond River Water Source,
(xv) Sandy Creek Water Source,
(xvi) Shannon Brook Water Source,
(xvii) Terania Creek Water Source,
(xviii) Toonumbar Area Water Source,
(xix) Tuckean Area Water Source,
(xx) Wyrallah Area Water Source, and
(xxi) Richmond Regulated Alluvial Water Source,
plus
(e) the share components of access licences granted under the
Regulation, clause 32 of this Plan, clause 50 of the Water Sharing Plan for the Richmond River Area
Unregulated, Regulated and Alluvial Water Sources 2010 and
section 61 (1) (c) of the Act, plus
(f) any additional local water utility access licence share component
issued under section 66 of the Act.
37 Variation of the long-term average extraction
limit
The long-term average extraction limit of this Unit may be varied
by the Minister if dealings under Part 11 of this Plan result in the issuing
or cancellation of access licences in this Unit.
Division 2 Available water determinations
38 Available water determinations
(1) This Division is made in accordance with section 20 (2) (b) of the
Act.
(2) In making an available water determination under section 59 of the
Act, the Minister should consider the following rules:(a) water extraction in this Unit will be monitored in each water
accounting year to determine if there is any growth in volumes extracted above
the extraction limit specified in clause 36, based on comparison of the
extraction limit against the average extraction within this Unit over the
preceding 3 water accounting years,Note. A water accounting year is defined in clause 43
(3).
(b) if water that, pursuant to an access licence, is committed as
adaptive environmental water to be left in a river for environmental purposes,
then for the purpose of subclause (a), the extraction will be assumed to be
100% of the available water determination,
(c) if water that, pursuant to an access licence, is committed as
adaptive environmental water to be extracted for environmental purposes, then
for the purpose of subclause (a), the extraction will be that measured through
the approved water supply work,
(d) for all access licences, an initial available water determination,
of such volume of water as is equivalent to two times the access licence share
component, should be made on 1 July 2003, and such determination should apply
for one water accounting year,
(e) from 1 July 2004, available water determinations for local water
utility and domestic and stock access licences should be of such volume of
water as is equivalent to the access licence share component, with priority
given to making this water available above the making of water available to
all other categories of access licence, and such determinations should be made
annually,
(f) from 1 July 2004, available water determinations for unregulated
river access licences and unregulated river (high flow) access licences,
including all subcategories, should be such volume of water as is equivalent
to the access licence share component, except as provided in subclauses (g)
and (h), and such determinations should be made annually,
(g) if the 3 year average of extraction in this Unit exceeds the
long-term average extraction limit established in clause 36 by 5% or greater,
then the available water determination for the following water accounting year
for unregulated river access licences and unregulated river (high flow) access
licences in this water source should be reduced by an amount that is assessed
necessary by the Minister to return subsequent total water extraction to the
long-term average extraction limit,
(h) if the 3 year average of extraction in this Unit is less than 95%
of the long-term average extraction limit established in clause 36, then the
available water determination for unregulated river access licenses and
unregulated river (high flow) access licenses in this water source shall be
increased to such an extent as to allow extraction to increase to that
extraction limit, and
(i) notwithstanding subclause (h), and excepting the initial available
water determination made under subclause (d), annual available water
determinations shall not exceed 100% for all licences with a share component
specified in ML per year and 1 ML per unit share for all access licence with a
share component specified as a number of unit
shares.
Part 10 Rules for managing access licences
Division 1 General
39 Rules for managing access licences
This Part is made in accordance with sections 20 (2) (b), 21 (a)
and 21 (c) of the Act, having regard to:(a) the environmental water rules established in Part 4 of this
Plan,
(b) requirements for water to satisfy basic landholder rights
identified in Part 5 of this Plan, and
(c) requirements for water for extraction under access licences in
Part 7 of this Plan.
Division 2 Water allocation account management
40 Water allocation account management
This Division is made in accordance with sections 20 (2) (b) and
21 (c) of the Act.
41 Water allocation accounts
In accordance with section 85 of the Act, a water allocation
account shall be established for each access licence in this water
source.Note. Water allocations may be assigned to, or from, these accounts by a
water allocation assignment made under section 71T of the Act, where these are
allowed under rules specified in Part 11 of this Plan.
Note. Water allocations may also be recredited to these accounts in
accordance with section 76 of the Act, subject to the operation of a return
flows scheme established under section 75 of the Act.
42 Accrual of water allocations
Water allocations will be accrued into water allocation accounts
in accordance with the Minister’s available water determinations as
specified in clause 38.
43 Annual accounting for water extraction
(1) Water taken from this water source will be accounted for at least
annually.
(2) Water extracted by a water supply work nominated by an access
licence is taken to be extracted and will be periodically debited against the
access licence water allocation account.
(3) A water accounting year shall be the 12 month period commencing 1
July.
(4) The maximum water allocation that can be carried over from one
water accounting year to the next is 100% of the access licence share
component.
(5) In any one water accounting year, water taken from this water
source under an access licence may not exceed the volume in the water
allocation account, subject to clause 43 (1).
(6) A water allocation account shall remain at or above zero at all
times.
44 Three year accounting for water extraction
(1) Water taken from this water source in any 3 consecutive water
accounting years under an access licence may not exceed a volume consisting
of:(a) the water allocations accrued under the licence in those
years,
(b) plus any water allocations assigned from another licence by a
water allocation assignment under section 71T of the Act in those
years,
(c) plus any water allocations recredited in accordance with section
76 of the Act in those years, and
(d) minus any water allocations assigned to another licence, by a
water allocation assignment under section 71T of the Act in those
years.
(2) Notwithstanding subclause (1), water taken under an access licence
from this water source in the first 3 water accounting years of this Plan may
not exceed a volume consisting of:(a) 3 times the share component of the access
licence,
(b) plus any water allocations assigned from another licence by a
water allocation assignment under section 71T of the Act in those
years,
(c) plus any water allocations recredited in accordance with section
76 of the Act in those years, and
(d) minus any water allocations assigned to another licence, by a
water allocation assignment under section 71T of the Act in those
years.
Division 3 Sharing flows on a daily basis
45 Sharing flows on a daily basis
This Division is made in accordance with sections 20 (2) (b) and
21 (a) of the Act.
46 Total daily extraction limits
(1) This Plan establishes a total daily extraction limit (hereafter
TDEL) for each flow
class as follows:(a) in the Upper Coopers Creek Management Zone:(i) 1.53 ML/day for A Class,
(ii) 4.92 ML/day for B Class, and
(iii) 5.09 ML/day for C Class.
(b) in the Lower Coopers Creek Management Zone:(i) 16.54 ML/day for A Class,
(ii) 53.15 ML/day for B Class, and
(iii) 54.98 ML/day for C Class.
Note. The combined TDEL in each flow class represent 45% of the top of A
Class flows, 45% of the top of B Class flows and for C Class flows 30% of the
30th percentile flows in December.
Note. The TDELs for the Upper and Lower Coopers Creek Management Zones
have been established based on the proportion of total access licence share
component within each management zone at the commencement of this
Plan.
(2) The TDEL for each flow class specified in subclause (1) applies to
all rivers within the specified zone of this water source, apart from those
rivers identified as minor streams in a harvestable rights order made under
section 54 of the Act.Note. The harvestable rights order applying to this water source at the
commencement of this Plan is that gazetted on 23 March 2001 under section 54
of the Act. It identifies minor streams as non-permanent 1st and 2nd order
streams as shown on topographic maps.
47 Initial assignment of the TDEL to categories of access
licence
(1) The TDEL for each flow class will initially be assigned to local
water utility access licences according to the following:(a) in the Upper Coopers Creek Management Zone:(i) 0 ML/day of A Class,
(ii) 0 ML/day of B Class, and
(iii) 0 ML/day of C Class,
(b) in the Lower Coopers Creek Management Zone:(i) 0 ML/day of A Class,
(ii) 0 ML/day of B Class, and
(iii) 0 ML/day of C Class.
(2) The TDEL for each flow class will initially be assigned to
domestic and stock access licences according to the following:(a) in the Upper Coopers Creek Management Zone:(i) 0.01 ML/day of A Class,
(ii) 0.01 ML/day of B Class, and
(iii) 0.01 ML/day of C Class,
(b) in the Lower Coopers Creek Management Zone:(i) 0.06 ML/day of A Class,
(ii) 0.06 ML/day of B Class, and
(iii) 0.06 ML/day of C Class.
(3) The TDEL for each flow class will initially be assigned to
unregulated river access licences according to the following:(a) in the Upper Coopers Creek Management Zone:(i) 1.52 ML/day of A Class,
(ii) 4.91 ML/day of B Class, and
(iii) 5.08 ML/day of C Class,
(b) in the Lower Coopers Creek Management Zone:(i) 16.48 ML/day of A Class,
(ii) 53.09 ML/day of B Class, and
(iii) 54.92 ML/day of C Class.
48 Unassigned TDEL
At the commencement of this Plan, there is no unassigned
TDEL.Note. Unassigned TDEL may vary as a result of the surrender,
cancellation or non-renewal of an access licence’s IDELs, or the
operation of Part 8 of this Plan.
49 Daily extraction limits for individual access licence
holders
(1) Each access licence requiring an IDEL, as specified in Part 12 of
this Plan, is assigned the same proportion of the TDEL specified in clause 47
as its share component bears to all the share components of licences of that
category.
(2) Notwithstanding subclause (1), in relation to those access
licences that are currently excluded from a flow class or part of a flow class
by existing conditions on the access licence or the water supply work
nominated by the access licence, the IDEL resulting from subclause (1) will be
adjusted to reflect as far as possible such an
exclusion.
50 Granting of unassigned TDEL
(1) Any unassigned TDEL may be assigned to access licences in the
following circumstances:(a) where they are granted as part of a new access
licence,
(b) to a local water utility access licence where the Minister varies
the access licence in accordance with sections 66 (3) or 66 (4) of the Act,
or
(c) to existing access licences for the purpose of pumping into farm
dams if:(i) the purpose of the additional IDEL sought is established by the
proponent,
(ii) the IDEL sought is the minimum required to satisfy that purpose,
and
(iii) the extraction is consistent with the objectives and principles of
this Plan.
(2) Where additional IDELs are assigned to an access licence in
accordance with this clause, the amount of IDEL so assigned shall be
determined by the Minister consistent with the ratios of share component to
IDEL for the specific category of access licence as initially assigned under
clause 49, as amended by clause 51.
51 Adjustment to TDELs and IDELs
(1) Where IDELs are assigned under clause 50, any unassigned TDEL is
reduced accordingly, and the TDEL assigned to the appropriate licence category
in clause 47 is increased accordingly.
(2) Pursuant to section 45 (1) (b) of the Act, if total extraction of
water under domestic and stock or native title rights exceeds the level
specified in Part 5 of this Plan:(a) first the unassigned TDEL specified in clause 48 then, if
necessary, the TDEL for unregulated river access licences in clause 47 (3)
shall be diminished to allow these additional basic landholder rights to be
met, and
(b) the IDELs of each unregulated river access licence shall then be
reduced to comply with this diminished TDEL.
(3) Pursuant to section 45 (1) (b) of the Act, if any unassigned TDEL
cannot meet either:(a) the IDEL requirements of applicants for new access licences for
local water utilities, domestic and stock access, unregulated river
(Aboriginal cultural) access, unregulated river (Aboriginal commercial)
access, and unregulated river (research) access, or
(b) a local water utility’s IDEL requirements resulting from a
variation by the Minister under sections 66 (3) or 66 (4) of the
Act,
then the TDEL for unregulated river access licences in clause 47 (c) will
be diminished to such an extent as to allow those requirements to be
met.
(4) Following an adjustment to the TDEL for unregulated river access
licences in subclause (3) the IDELs of each unregulated river access licence
will then be reduced to comply with this diminished
TDEL.
(5) Any adjustment to unregulated river access licence IDELs arising
from this clause will be done at intervals of no greater than 5
years.
(6) If A or B class daily extraction limits are surrendered in
accordance with clause 32 (2) (d), the TDEL for unregulated river access
licences in clause 46 (1) and clause 47 (3) will be reduced to reflect this
change, and the planned environmental water in clause 21 (1) (b) and (c)
increased by a corresponding amount.
(7) If water that, pursuant to an access licence:(a) is committed to adaptive environmental water, then the TDEL for
classes specified on the committed access licence in the specified category
will be reduced by the IDEL on the access licence so committed and clauses 46
and 47 adjusted accordingly, or
(b) is uncommitted to adaptive environmental water, then the TDEL for
classes specified on the committed access licence in the specified category
will be increased by the IDEL on the access licence so uncommitted and clauses
46 and 47 adjusted accordingly.
(8) The TDELs specified in clause 46, and the assignment of TDELs
specified in clause 47, shall be varied in accordance with any dealing under
sections 71M, 71N or 71Q of the Act between the Upper Coopers Creek Management
Zone and the Lower Coopers Creek Management Zone.
52 Administrative arrangements for managing access to daily
flows
(1) Notwithstanding the forgoing provisions of this Division, this
Plan allows group management of access licences with respect to the
IDELs.
(2) The Minister may determine that, from the commencement of this
Plan and until otherwise determined:(a) all access licences with IDELs shall be made part of a group
maintained by the Minister, and
(b) access licences with IDELs will be assessed as a whole against
their combined IDELs.
(3) At any time when subclause (2) does not apply:(a) access licence holders may make a request to form a group for
their access licences,
(b) access licence holders may have their access licence removed from
a group, in which case they shall be permitted to extract under that licence a
maximum of the licensed IDEL, and
(c) where an access licence is removed or added to a group, the group
combined IDEL shall be adjusted by the amount of IDEL on the subject
licence.
(4) Groups will be managed according to the following rules:(a) daily extraction by a group cannot exceed the combined IDELs of
all access licences in the group,
(b) where it been assessed that a holder of an access licence within a
group is repeatedly causing the combined IDEL to be exceeded then the Minister
may remove that access licence from the group,
(c) where daily extraction by a group exceeds the combined IDELs of
all access licences in the group, then the Minister may dissolve the group and
require each access licence holder to comply with the licensed
IDELs,
(d) should a holder of an access licence which is part of a group
commit the IDELs of that licence to the environment consistent with section 8
(1) (c) of the Act, then those IDELs shall be removed from the
group,
(e) an access licence may not be in more than one group,
and
(f) the Minister may refuse to allow an access licence to be included
in a group, and may refuse a request to form a
group.
53 Infrastructure failure
In the event of infrastructure failure, the Minister can elect
to:(a) continue to announce the current flow class,
(b) announce another flow class based on climatic conditions and any
other flow gauging information, or
(c) restrict access to water to the lowest flow
class.
Note. Infrastructure is defined in the dictionary.
Note. If satisfied that it is necessary to do so in the public interest,
the Minister may direct the holders of an access licence to cease using a
water supply work in accordance with section 323 of the
Act.
Part 11 Access licence dealing rules
54 Access licence dealing rules
(1) This Part is made in accordance with section 20 (1) (d) of the Act
and with the Minister’s access licence dealing principles gazetted on 27
December 2002 under section 71Z of the Act.
(2) Applications for access licence dealings may be granted subject to
the Minister’s access licence dealing principles gazetted from time to
time under section 71Z of the Act and the rules in this
Part.
Note. There are a number of mechanisms within the Act, called access
licence dealings, to change either the ownership of all or part of an access
licence, or the location within a water source at which all or part of the
share and extraction components of access licences can be exercised. These
dealings are governed by the principles in section 5 of the Act, the
Minister’s access licence dealing principles, and the rules in this
Part.
Note. Where there is an inconsistency between access licence dealing
rules established in this Plan and Minister’s access licence dealing
principles gazetted subsequent to the commencement of this Plan, section 71Z
of the Act provides for the access licence dealing rules in this Plan to
prevail.
55 Rules relating to constraints within this water
source
(1) This clause applies to any relevant dealings under sections 71Q,
71S and 71W of the Act, and with respect to water allocation assignments
within this water source under section 71T of the
Act.
(2) Dealings under sections 71Q, 71S and 71T of the Act are prohibited
under this clause if the dealing is from an access licence which nominates a
water supply work:(a) outside of the Restricted Trading Zone, to an access licence which
nominates a water supply work within the Restricted Trading
Zone,
(b) in the Upper Coopers Creek Management Zone, to an access licence
which nominates a water supply work in the Lower Coopers Creek Management
Zone,
(c) in the Lower Coopers Creek Management Zone, to an access licence
which nominates a water supply work in the Upper Coopers Creek Management
Zone, and
(d) on a tributary river of Coopers Creek, to an access licence which
nominates a water supply work on Coopers Creek.
(3) Dealings under section 71S of the Act are prohibited under this
clause if the dealing involves a change to a management zone specified in the
extraction component of an access licence.
(4) Dealings under section 71W of the Act are prohibited under this
clause if the dealing involves an access licence which nominates a water
supply work:(a) outside of the Restricted Trading Zone, nominating a water supply
work within the Restricted Trading Zone,
(b) in the Upper Coopers Creek Management Zone, nominating a water
supply work in the Lower Coopers Creek Management Zone,
(c) in the Lower Coopers Creek Management Zone, nominating a water
supply work in the Upper Coopers Creek Management Zone,
and
(d) on a tributary river of Coopers Creek, nominating a water supply
work on Coopers Creek.
56 Rules for access licence dealings which alter the times,
rates or circumstances specified in access licence extraction
components
Notwithstanding clause 55, applications under section 71S of the
Act to vary the times, rates or circumstances specified in an access licence
with respect to the taking of water under the licence are prohibited, unless
the dealing is in accordance with clause 50.
57 Rules for change of water source
(1) This clause relates to dealings under section 71R of the
Act.Note. Section 71R dealings are the mechanism by which access licences
can move from one water source to another. Once the change in water source has
been affected, if permitted, the new licence will have to nominate specified
works (by a dealing under section 71W of the Act) in the receiving water
source before extraction can commence.
(2) Dealings under section 71R of the Act are prohibited in this water
source, unless provided for in this clause.
(3) An access licence with a share component specifying this water
source may be cancelled and a new licence issued in another water source only
if the new access licence issued is within this Unit, and the access licence
dealing rules in the other water source permit such a
dealing.
(4) An access licence with a share component specifying another water
source may be cancelled and a new licence issued in this water source only if
the access licence dealing rules in the other water source permit such a
dealing, and(a) the access licence cancelled is within this Unit,
and
(b) the total access licence share components in this water source do
not increase above those existing at the commencement of this
Plan.
(5) The volume of share component on an access licence issued under
this clause is to be the volume of the cancelled access licence share
component.
(6) The extraction component of the cancelled access licence is not to
be carried over to the new access licence.
58 Rules for conversion of access licence
(1) This clause relates to dealing under section 71O of the
Act.
(2) Conversion of an access licence of one category to an access
licence of another category are permitted only if the conversion is from an
unregulated river access licence to an unregulated river (high flow) access
licence.
(3) For any conversion of an access licence under subclause (2) the
access licence being converted shall be cancelled and a new licence
issued.
(4) The share component of the access licence issued under subclauses
(2) and (3) is to be equal to 3 times the cancelled access licence share
component.
(5) The total amount of all unregulated river (high flow) access
licence share components converted under subclauses (2) and (3) shall be
limited to 3000 unit shares.
59 Rules for interstate access licence transfer
(1) This clause relates to dealings under section 71U of the
Act.
(2) Dealings that result in the interstate transfer of an access
licence into or out of this water source are
prohibited.
60 Rules for water allocation assignments between water
sources
(1) This clause relates to dealings under section 71T of the Act, in
relation to water allocation assignments between water
sources.
(2) Dealings under section 71T of the Act that result in water
allocation assignments to or from access licences in this water source are
prohibited unless provided for in this clause.
(3) Dealings that assign water allocations between access licences
inside this water source and access licences outside this water source, but
inside this Unit, are permitted only if the access licence dealing rules in
the other water source permit such a dealing.
(4) Dealings that assign water allocations between access licences
inside this water source, are permitted, subject to clause
55.
Note. Each water allocation assignment must be applied for. Licence
holders may enter into private contracts to assign water allocations for a
number of years. Such contracts are not guaranteed by the Government, and
approval must be sought annually. Approval will be subject to the rules in
this Plan, including local impact assessment.
61 Rules for interstate assignment of water
allocations
(1) This clause relates to dealings under section 71V of the
Act.
(2) Dealings that result in interstate assignment of water allocations
to or from this water source are prohibited.
Part 12 Mandatory conditions
62 Mandatory conditions on access licences
(1) This Part is made in accordance with sections 17 (c) and 20 (2)
(e) of the Act.
(2) All access licences shall have mandatory conditions in relation to
the following:(a) the specification of the share component of the access
licence,
(b) the specification of the extraction component of the access
licence, including IDELs arising from the operation of Part 10 Division 3 of
this Plan where applicable, and the variation thereof,
(c) the requirement that extraction under the access licence will be
subject to the available water determinations,
(d) the requirement that extraction under the access licence will be
subject to the water allocation account management rules established in Part
10 Division 2 of this Plan,
(e) the requirement that the taking of water in accordance with the
access licence will only be permitted if the resulting debit from the access
licence water allocation account will not exceed the volume of water
allocation remaining in the account,
(f) the requirement that water may only be taken under the access
licence by the water supply work nominated by the access licence,
and
(g) any other conditions required to implement the provisions of this
Plan.
63 Very low flow access conditions
(1) Notwithstanding any cease to pump conditions established on the
licence, during periods of very low flows, holders of access licences listed
on Schedule 4 may continue to access water to comply with the requirements of
the Food Production (Safety) Act or the Prevention of Cruelty to Animals Act
for the following purposes:(a) fruit washing,
(b) cleaning of dairy plant and equipment for the purpose of
hygiene,
(c) poultry watering and misting, and
(d) cleaning of enclosures used for intensive animal production for
the purposes of hygiene.
(2) The maximum daily volume that can extracted under subclause (1)
will be the minimum required to satisfy the purposes in that subclause, will
be individually assessed and specified on each access licence within 12 months
of the commencement of this Plan, will not exceed 20 kilolitres per day, and
will not be increased.
(3) Upon written request by the holder of an access licence, the
Minister may add a licence to Schedule 4, but only if the licence meets the
purpose requirements established in subclause (1), and the purpose existed
prior to 1 July 2004.
(4) A licence will be removed from the Schedule if:(a) any access licence dealing results in the water being extracted
from a different location,
(b) an alternative water supply is obtained, that satisfies the
requirements of subclause (1), or
(c) the licence is surrendered, cancelled, or not
renewed.
(5) Notwithstanding subclauses (1) to (4), extraction of water by an
approved water supply work is only permitted if there is visible flow in the
river in the vicinity of the work.
(6) An assessment of the continuing requirements for access under this
clause will be undertaken before the end of the Plan, and the schedule amended
or deleted at the end of the Plan, if such a review determines that this
concessional access is no longer required.
(7) The assessment made under subclause (6) will be undertaken for the
Plan as a whole, and for each individual licence on the
Schedule.
64 Additional mandatory conditions on unregulated river
access licences
All unregulated river access licences shall have mandatory
conditions to give effect to the following:(a) water may not be taken when flows are within the Very Low Flow
Class, except where subclauses (e) and (f) apply,
(b) if A Class, B Class or C Class has been determined by the
Minister, water may only be taken at a rate not exceeding that specified for
the flow class on the access licence extraction component, unless otherwise
authorised through a registered group, and except where subclauses (d) and (f)
apply,
(c) if A Class, B Class or C Class has not been determined by the
Minister and flows exceed the Very Low Flow Class then water may be taken
without any restriction in rate or timing, except where subclause (d)
applies,
(d) if flows have risen from the Very Low Flow Class to more than 31
ML/day within a 24 hour period, water may not be taken in the 48 hour period
after flows first exceeded 31 ML/day,
(e) subclauses (a) and (d) shall not apply to an access licence listed
in Schedule 4, and
(f) subclauses (a) and (b) do not apply to extractions from an
in-river dam while the dam is passing all inflows.
65 Additional mandatory conditions on local water utility
access licences
All local water utility access licences shall have mandatory
conditions to give effect to the following:(a) water may not be taken when flows are within the Very Low Flow
Class, except where subclause (e) applies,
(b) if A Class, B Class or C Class has been determined by the
Minister, water may only be taken at a rate not exceeding that specified for
the flow class on the access licence extraction component, unless otherwise
authorised through a registered group, and except where subclauses (d) and (e)
apply,
(c) if A Class, B Class or C Class has not been determined by the
Minister and flows exceed the Very Low Flow Class then water may be taken
without any restriction in rate or timing, except where subclause (d)
applies,
(d) if flows have risen from the Very Low Flow Class to more than 31
ML/day within a 24 hour period, water may not be taken in the 48 hour period
after flows first exceeded 31 ML/day,
(e) subclauses (a) and (b) do not apply to extractions from an
in-river dam while the dam is passing all inflows.
66 Additional mandatory conditions on domestic and stock
access licences
All domestic and stock access licences shall have mandatory
conditions to give effect to the following:(a) water may not be taken when flows are within the Very Low Flow
Class, except where subclause (e) applies,
(b) if A Class, B Class or C Class has been determined by the
Minister, water may only be taken at a rate not exceeding that specified for
the flow class on the access licence extraction component, unless otherwise
authorised through a registered group, and except where subclauses (d) and (e)
apply,
(c) if A Class, B Class or C Class has not been determined by the
Minister and flows exceed the Very Low Flow Class then water may be taken
without any restriction in rate or timing, except where subclause (d)
applies,
(d) if flows have risen from the Very Low Flow Class to more than 31
ML/day within a 24 hour period, water may not be taken in the 48 hour period
after flows first exceeded 31 ML/day,
(e) subclauses (a) and (b) do not apply to extractions from an
in-river dam while the dam is passing all inflows.
67 Runoff harvesting access licences
All runoff harvesting access licences shall have a mandatory
condition imposed on them specifying that water may be taken without
restriction in rate, but only from the specified work.
68, 69 (Repealed)
70 Additional mandatory conditions on unregulated river (high
flow) access licences
All unregulated river (high flow) access licences shall have
mandatory conditions to give effect to clauses 21 (2) (b) (iv) and 21 (2)
(c).
71 Mandatory conditions on water supply works
approvals
All approvals for water supply works in this water source shall
have mandatory conditions in relation to the following:(a) flow measurement devices:(i) shall be installed and maintained on all works used for extraction
of water under an access licence, and
(ii) shall be of a type and shall be maintained in a manner which is
acceptable to the Minister,
(b) water extraction and property water management infrastructure
details shall be provided to the Minister on request,
(c) it is the responsibility of the work approval holder to ascertain
from the Minister the flow class at any time before commencing to take water
under an access licence with an IDEL,
(d) notwithstanding all other rights and conditions, extraction of
water from a river by an approved water supply work is not permitted if there
is no visible flow in the river in the vicinity of the
work,
(e) extraction under an access licence through an approved work is
only authorised with respect to the work nominated by the access
licence,
(f) a 100 metre buffer will be applied between any endangered
ecological community and the location of any new water supply work, if
required to protect the endangered ecological community,
and
(g) appropriate buffers will be applied between any Aboriginal sites
of spiritual, cultural or social values as identified by the Bundjalung Elders
and the relevant Aboriginal Land Council, and the location of any new water
supply work, if required to protect the Aboriginal sites of spiritual,
cultural or social values.
Part 13 Granting and amending water supply works
approvals
72 Granting and amending water supply works
approvals
This Part is made in accordance with section 21 (b) of the
Act.
73 Runoff harvesting dams
(1) New or expanded runoff harvesting dams shall, in addition to other
considerations, be subject to the dam capacity not exceeding that which is
consistent with the access licence share component specifying the runoff
harvesting dam as the nominated work.
(2) When the water allocations that may be taken from a runoff
harvesting dam are reduced either by the Minister, or on application of the
approval holder, or by an assignment in accordance with Part 11 of this Plan,
the Minister may impose an additional condition requiring the dam to be
modified so as to reduce its capacity, or requiring the water taken and
evaporated from the dam to be reduced, consistent with the reduction in water
allocations available.
Note. Extraction of water from a runoff harvesting dam requires a runoff
harvesting access licence, unless the runoff harvesting dam is within the
maximum harvestable right dam capacity for the property on which it is
located, in which case no licences or approvals are required. Runoff
harvesting is a category of access licence to be established by regulation
under section 57 (k) of the Act.
74 In-river dams
No new in-river dams shall be approved within this water
source.Note. Taking of water from an in-river dam requires an access licence
unless it is taken in accordance with section 52 of the Act (domestic and
stock rights). In either case, however, the dam requires a water management
works approval unless exempted by regulation under the
Act.
Part 14 Monitoring and reporting
75 Monitoring and reporting of performance
indicators
The monitoring of the performance indicators specified in clause
12 of this Plan shall be undertaken by the Minister.Note. Review and Audit of this PlanIn accordance with section 43A of the Act, the Natural Resources
Commission must undertake a review of this Plan prior to any decision to
extend its term or to make a new plan. The review must consider the extent to
which the Plan’s water sharing provisions have contributed to achieving
or not achieving the relevant natural resource management standards and
targets in the catchment management area (as referred to in section 5 of the
Catchment Management Authorities Act
2003).
When undertaking this review the Natural Resources Commission is
required to call for public submissions. The Commission will take into
consideration any submission received as well as any other relevant State-wide
or regional government policies or agreements that apply to the catchment
management area.
In accordance with section 44 of the Act, this Plan will be
audited at intervals of no more than five years, for the purpose of
ascertaining whether its provisions are being given effect to. This audit is
to be carried out by an audit panel appointed by the Minister in consultation
with the water management committee, where one exists.
Note. Implementation ProgramIn accordance with section 51 of the Act, the Minister may
establish an Implementation Program that sets out the means by which the
provisions of this Plan are to be achieved.
It is proposed that the Minister establish an Implementation
Program for this Plan. Pursuant to section 51 (5) of the Act, the
Implementation Program is to be reviewed annually by the Minister to determine
whether it is effective in implementing this Plan.
The results of the review of the Implementation Program are
included in the annual report for the Department.
Part 15 Amendment of this Plan
76 Amendment of this Plan
This Part is made in accordance with section 45 (1) (b) of the
Act.
77 Additional access rules under planned environmental
water
The Minister may amend this Plan in accordance with clauses 21
(3), (4), (5) and (6) in respect to additional access rules for licence
holders.
78 (Repealed)
79 Other amendments of this Plan
The Minister may amend this Plan in accordance with:(a) clause 17 (3) in respect to the Very Low Flow Class and A Class
threshold flow rates, and
(b) clause 51 in respect to adjustments to TDELs and
IDELs.
80 Amendment relating to planned environmental
water
(1) The Minister may amend this Plan to provide for the recovery of
planned environmental water as follows:(a) the recovery is only to apply where the Minister has cancelled an
access licence held by the Minister in accordance with section 8A of the
Act,
(b) the amount of additional water to be provided as planned
environmental water is to be equivalent to the annual average extraction of
water under the cancelled licence over the long-term,
(c) the average annual long-term availability of water for the
remaining access licences that relate to the water source concerned is to be
reduced by the average annual long-term extraction of water under the
cancelled licence.
(2) The Minister may amend this Plan to specify the purposes for which
planned environmental water committed under section 8A of the Act is to be
used.
81 Amendment of Plan relating to floodplain
harvesting
The Minister may amend this Plan so as to provide for the
floodplain harvesting of water by amending the waters or water sources to
which this Plan applies and by consequential amendments so long as the
amendments:(a) if the Plan has already taken into consideration floodplain
harvesting extractions, do not affect the outcomes of the long-term extraction
limit specified in the Plan, or
(b) if the Plan has not already taken into consideration floodplain
harvesting extractions, do not allow more water being taken pursuant to access
licences for floodplain harvesting than permitted under Schedule F to the
Agreement within the meaning of the Murray–Darling Basin Act
1992.
Schedule 1 Dictionary
The following definitions apply to this Plan in addition to the
definitions set out in the Act:
account water is
the balance in an access licence water allocation account at a particular
time.
Note. An access licence water allocation account records water
allocations accrued under the licence as well as water allocations taken,
assigned or re-credited. The operation of the account is also governed by
rules for the carrying over of credits from one accounting period to the next
and rules for the maximum credit that may be allowed to accumulate in the
account as established in a water sharing plan. Water allocations are the
shares of available water accrued under an access licence from time to time as
a result of available water determinations.
conversion
factor refers to the adjustment factor that is to be applied to an
access licence share component when it is cancelled in one water source, and
reissued in a different water source and visa versa, or when the access
licence is converted from one category to another. It is designed to provide
for the fact that the value of a unit of share component in terms of the
average water allocations that result from it may vary from one water source
to another, or from one category to another.
endangered
ecological communities means ecological communities listed in
Schedule 1 of the Threatened Species
Conservation Act 1995 or Schedule 4 of the Fisheries Management Act
1994.
extraction
limit is a limit on the amount of water that may be extracted from
an extraction management unit.
extraction
management unit is a group of water sources for the purpose of
managing annual average extraction.
farm dam is a privately
owned dam typically of earthen construction designed to collect and/or store
water for use on one or a few properties. It does not include publicly owned
dams or weirs. See also in-river
dam and runoff
harvesting dam.
flow classes are
categorised by the size and duration of flow levels in unregulated rivers, for
example:
(a) Very Low Flows may be a class on their own,
(b) low flows may be categorised as A Class flows,
(c) moderate flows may be categorised as B Class flows,
and
(d) high flows may be categorised as C Class
flows.
flow gauging
station is a device that is used to measure the height of a river,
from which the flow in the river can be calculated.
individual daily extraction
limit (IDEL) is the volume of water that may be extracted by an
individual access licence from an unregulated river on a daily basis from a
particular flow class.
infrastructure
includes, but is not limited to, a:
(a) flow gauging device or any other appliance that is used to measure
the height of a river relative to a known datum point, from which the flow in
the river can be calculated, or
(b) flow announcement system which is the mechanism by which the
Minister communicates daily flow classes to the holders of an access licence
within this water source.
in-river dam is
a dam on a 3rd, 4th or higher order river. 3rd, 4th or higher order rivers are
as defined in the Order made under section 5 of the Water Act 1912 in relation to the
definition of a “river” gazetted 23 March 2001. See also farm dam and runoff harvesting
dam.
stock watering
means the watering of stock being raised on the land, but does not include the
use of water in connection with intensive animal husbandry.
runoff
harvesting dam is a farm dam on a hillside or 1st or 2nd order
stream which collects and stores rainfall runoff. 1st and 2nd order streams
are as defined in the Order made under section 5 of the Water Act 1912 in relation to the
definition of a river gazetted 23 March 2001. See also farm dam and in-river dam.
Note. This Order refers to watercourses shown as blue lines on
topographic maps. The lines which are uppermost in a catchment are 1st order
streams, when two 1st order streams are joined they make a 2nd order stream,
etc. For more information, see the Farm Dams Assessment Guide available from
the Department of Water and Energy.
total daily
extraction limit (TDEL) is the volume of water that may be extracted
under access licences from an unregulated river on a daily basis from a
particular flow class.
Schedule 2 Coopers Creek Water Source

Schedule 3 Rivers in the Coopers Creek Water
Source
This water source includes, without limitation:
Bennys Creek
Boomerang Creek
Byrangery Creek
Coopers Creek
Dans Creek
Little Bennys Creek
Numalgi Creek
Repentance Creek
Turkey Creek
Yankey Creek
Schedule 4 Access licences with access to the Very Low Flow
Class
Access licence number | Purpose |
30SL037403 | Dairy washdown |
30SL039160 | Dairy washdown |
30SL039693 | Piggery hosedown |
30SL040380 | Dairy washdown |
30SL066147 | Chicken cooling |
30SL066308 | Dairy washdown |
30SL066309 | Dairy washdown |
Note. The access licence details in this Schedule may change during the
period of this Plan. The offices of the Department of Water and Energy, shown
in Appendix 2, should be contacted for a current list.
Schedule 5 (Repealed)
Schedule 6 Richmond River Extraction Management
Unit

Appendix 1 Northern Rivers Water Management Area

Appendix 2 Location of maps
The maps in relation to this Plan may be inspected at:
Department of Water and Energy
Suite 6, Alstonville Plaza
ALSTONVILLE NSW 2477
Department of Water and Energy
76 Victoria Street
GRAFTON NSW 2460
Appendix 3 Performance indicators
Performance indicators for the Coopers Creek Water Sharing
Plan |
Performance indicator | Related objective | As measured by | Commentary |
(a) Change in low flows.
| 11 (a) 11 (d) 11 (e) 11 (f) 11 (g) | • Assessment of change in flow duration characteristics, from time
of Plan commencement, at identified reference
points.
| • River Flow Objectives (RFOs) 1, 2 and 6. RFOs are the objectives agreed to by the NSW Government aimed at
safeguarding river flows for environmental health.Note. Not every objective is relevant to every river in
NSW.
• Plan will contribute to a decrease in the frequency and duration
of low flows.
• This assessment will focus on the plan’s end of system
reference point(s), and will be based on a qualitative assessment of
compliance with the water sharing rules, due to the current modelling
limitations in most unregulated rivers.
• Where data is limited, it is only possible to assess change from
the period of plan commencement to the time the indicator is
assessed.
• There will be a high climatic influence on changes to the flow
characteristics, depending on if the time period of assessment has been wet or
dry.
|
(b) Change in moderate to high flows.
| 11 (a) 11 (e) 11 (f) 11 (g) | • Assessment of change in flow duration characteristics, from time
of Plan commencement, at identified reference
points.
| • RFO 3.
• Plan will maintain or increase the frequency and duration of
moderate to high flows.
• This assessment will focus on plan’s end of system reference
point(s), and will be based on a qualitative assessment of compliance with the
water sharing rules, due to the current modelling limitations in most
unregulated rivers.
• Where data is limited, it is only possible to assess change from
the period of plan commencement to the time the indicator is
assessed.
• There will be a high climatic influence on changes to the flow
characteristics, depending on if the time period of assessment has been wet or
dry.
|
(c) Change in ecological condition of this water source and dependent
ecosystems.
| 11 (f) 11 (b) 11 (g) | • Periodic assessment of identified attributes of this water source
and dependent ecosystems.
| • The ecological influence of the Plan is limited to providing for
changes in flow regime aimed at improving the ecological condition of the
water source and dependent ecosystems.
• The focus of this performance indicator will be the effect of flow
strategies.
• Information on flow requirements of ecological systems is limited
so physical or hydraulic surrogates will be used to assess the influence of
the Plan. For example, the status of wetted area, depth in pools and flow
velocity over riffles.
• In addition to the environmental water provisions defined in this
Plan, there are many other factors that contribute to achievement of
ecological objectives. Riparian vegetation, water quality, farming techniques,
soil erosion, water flow patterns and other catchment characteristics all
significantly influence ecological condition. It is difficult to assess which
factor is the most influential at a particular time and
place.
• Research and development into the impacts of flow on ecological
condition will be incorporated into assessment of the plan where the
information is available and relevant.
|
(d) Extent to which basic landholder rights requirements have been
met.
| 11 (a) | Assessment of cease to pump levels in relation to
basic rights requirements. | • Basic landholder rights usage figures in water sharing plans are
estimated (not actual use).
|
(e) Change in economic benefits derived from water extraction and
use.
| 11 (e) 11 (f) 11 (g) | • Number of days access provided over the time of the
plan.
• Number of new off stream storages.
• Change in unit price of water transferred.
• Change in gross margins.
| • There are many factors affecting economic status of a region, for
example commodity prices.
• Measurement of the number of new off stream storages will indicate
the adjustment to the rules and the ongoing access to
water.
• Assessment undertaken as part of plan performance monitoring will
make assumptions to attempt to identify the impact of the plan
provisions.
• The data can reflect changes in crops, commodity prices, climate,
water availability, economic climate and input
costs.
|
(f) Extent to which native title rights requirements have been
met.
| 11 (b) | • Assessment of amount and type of information collected to identify
the range of values of water to Aboriginal people.
| • The collection of information on the values associated with water
is considered the first step in addressing the objects of the Act. It would be
expected that at the end of five years there should be relevant information
collected for each water source, as a minimum
requirement.
|
(g) Extent of recognition of spiritual, social and customary values of
water to Aboriginal people.
| 11 (b) | • Assessment of amount and type of information collected to identify
the range of values of water to Aboriginal people.
• The number referrals to Local Aboriginal Land Councils and
Bundjalung Elders.
• Information on the number of water transfers and number of new
licence applications for interpretation.
| • The collection of information on the values associated with water
is considered the first step in addressing the objects of the Act. It would be
expected that at the end of five years there should be relevant information
collected for each water source, as a minimum requirement.
• Consultation with the local Aboriginal community will seek to
minimise effects on important social, customary, cultural, and spiritual
values.
|
Appendix 4 (Repealed)
Historical notes
The following abbreviations are used in the Historical notes:
Am |
amended |
LW |
legislation website |
Sch |
Schedule |
Cl |
clause |
No |
number |
Schs |
Schedules |
Cll |
clauses |
p |
page |
Sec |
section |
Div |
Division |
pp |
pages |
Secs |
sections |
Divs |
Divisions |
Reg |
Regulation |
Subdiv |
Subdivision |
GG |
Government Gazette |
Regs |
Regulations |
Subdivs |
Subdivisions |
Ins |
inserted |
Rep |
repealed |
Subst |
substituted |
Table of amending instruments
Water Sharing
Plan for the Coopers Creek Water Source 2003 published in
Gazette No 45 of 14.2.2003, p 1721 and amended as follows:
Water Management Act 2000 No
92. Assented to 8.12.2000. Date of commencement of Sch 12, 1.1.2006,
sec 2 (1) of the Water Management Amendment
Act 2005 and GG No 157 of 16.12.2005, p 10884. Amended by
Water Management Amendment Act 2005
No 118. Assented to 7.12.2005. Date of commencement of Sch 1 [58],
1.1.2006, sec 2 (1) and GG No 157 of 16.12.2005, p 10884.
Water Management (Ministers’ Plans)
Amendment Order 2003 (GG No 101 of 20.6.2003, p 5804 (see also
GG No 104 of 27.6.2003, p 6352))
Water Management (Ministers’ Plans)
Further Amendment Order 2003 (GG No 197 of 19.12.2003, p
11451)
Water Management
(General) Regulation 2004 (GG No 110 of 1.7.2004, p
5008)
Water Management (Minister’s Plans)
Order No 2 of 2004 (GG No 110 of 1.7.2004, p 5072)
Statute Law (Miscellaneous Provisions)
Act (No 2) 2004 No 91. Assented to 10.12.2004. Date of
commencement of Sch 2.94, assent, sec 2 (2).
2006 | No 58 | Statute Law (Miscellaneous
Provisions) Act 2006. Assented to 20.6.2006. Date of commencement of Sch 2.73, assent, sec 2
(2).
|
2009 | (40) | Order. GG No 29 of 6.2.2009, p 814. Date of commencement, on gazettal.
|
| | No 56 | Statute Law (Miscellaneous
Provisions) Act 2009. Assented to 1.7.2009. Date of commencement of Sch 2.76, 17.7.2009, sec 2
(2).
|
2010 | (700) | Water Sharing Plan for the Coopers
Creek Water Source Amendment Order 2010. LW 17.12.2010. Date of commencement, on publication on LW, cl
2.
|
2011 | (114) | Water Sharing Plan for the Coopers
Creek Water Source Amendment Order 2011. LW 2.3.2011. Date of commencement, on publication on LW, cl 2. The amendments made by
Sch 1 [1] and [14] were without effect.
|
Table of amendments
Cl 3 | Am 20.6.2003; 19.12.2003. |
Cl 4 | Subst 2009 (40), Sch 1 [1]. |
Cl 8 | Rep 2011 (114), Sch 1 [2]. |
Cl 11 | Subst 2011 (114), Sch 1 [3]. |
Cl 13 | Am 1.7.2004. |
Cl 17 | Subst 2009 (40), Sch 1 [2]. Am 2009 No 56, Sch 2.76
[1]. Subst 2011 (114), Sch 1 [4]. |
Cl 18 | Subst 2011 (114), Sch 1 [5]. |
Cl 19 | Subst 2009 (40), Sch 1 [3]; 2011 (114), Sch 1
[6]. |
Cl 21 | Am 1.7.2004. Subst 2009 (40), Sch 1 [4]; 2011
(114), Sch 1 [7]. |
Cl 22 | Rep 2011 (114), Sch 1 [8]. |
Cl 23 | Rep 2011 (114), Sch 1 [9]. |
Cl 24 | Am 2000 No 92, Sch 12, Part 1 (ins 2005 No 118, Sch
1 [58]). Subst 2009 (40), Sch 1 [5]. |
Cl 31 | Am 2009 (40), Sch 1 [6]. |
Cl 32 | Am 1.7.2004. Subst 2009 (40), Sch 1 [7]. Am 2009 No
56, Sch 2.76 [2]. |
Cl 33 | Am 1.7.2004; 2004 No 91, Sch 2.94
[1]. |
Cl 36 | Am 2009 (40), Sch 1 [8]. Subst 2010 (700), Sch 1
[1]. |
Cl 38 | Am 1.7.2004. Subst 2010 (700), Sch 1 [1]. Am 2011
(114), Sch 1 [10]–[13]. |
Cl 43 | Subst 1.7.2004. |
Cl 46 | Subst 2009 (40), Sch 1 [9]. |
Cl 47 | Subst 2009 (40), Sch 1 [10]. Am 2009 No 56, Sch
2.76 [3]. |
Cl 51 | Am 1.7.2004; 2009 (40), Sch 1
[11]–[13]. |
Cl 54 | Am 1.7.2004. |
Cl 55 | Am 2004 No 91, Sch 2.94 [2]; 2009 (40), Sch 1 [14].
Subst 2011 (114), Sch 1 [15]. |
Cl 58 | Subst 2011 (114), Sch 1 [16]. |
Cl 63 | Subst 1.7.2004. |
Cl 64 | Subst 2009 (40), Sch 1 [15]; 2011 (114), Sch 1
[17]. |
Cl 65 | Subst 2009 (40), Sch 1 [16]; 2011 (114), Sch 1
[18]. |
Cl 66 | Subst 2009 (40), Sch 1 [17]; 2011 (114), Sch 1
[19]. |
Cl 68 | Subst 2009 (40), Sch 1 [18]. Rep 2011 (114), Sch 1
[20]. |
Cl 69 | Subst 1.7.2004; 2009 (40), Sch 1 [19]. Rep 2011
(114), Sch 1 [21]. |
Cl 70 | Subst 2009 (40), Sch 1 [20]; 2011 (114), Sch 1
[22]. |
Cll 75, 76 | Subst 1.7.2004. |
Cl 77 | Am 1.7.2004. Subst 2009 (40), Sch 1 [21]; 2011
(114), Sch 1 [23]. |
Cl 78 | Am 1.7.2004; 2009 (40), Sch 1 [22]. Rep 2011 (114),
Sch 1 [24]. |
Cl 79 | Subst 2011 (114), Sch 1 [25]. |
Cl 80 | Ins 2000 No 92, Sch 12, Part 2 (ins 2005 No 118,
Sch 1 [58]). |
Cl 81 | Ins 2000 No 92, Sch 12, Part 3 (ins 2005 No 118,
Sch 1 [58]). |
Sch 1 | Am 2009 (40), Sch 1 [23] [24]. |
Sch 2 | Am 1.7.2004; 2009 (40), Sch 1 [25]; 2011 (114), Sch
1 [26]. |
Sch 4, heading | Subst 2009 (40), Sch 1 [26]. |
Sch 4 | Am 1.7.2004; 2009 (40), Sch 1
[27]. |
Sch 5 | Am 2006 No 58, Sch 2.73 [1]. Rep 2011 (114), Sch 1
[27]. |
Appendix 2 | Subst 2009 (40), Sch 1 [28]. |
Appendix 3 | Subst 1.7.2004. Am 2006 No 58, Sch 2.73
[2]. |
Appendix 4 | Rep 1.7.2004. |
The whole plan | Am 1.7.2004 (“section 42 (2)” omitted
wherever occurring in relation to references to the Water Management Act 2000,
“section 45 (1) (b)” inserted instead; “section 71A”
omitted wherever occurring in relation to references to the Water Management Act 2000,
“section 71M” inserted instead; “section 71B”,
“section 71C”, “section 71D”, “section
71E”, “section 71F”, “section 71G”,
“section 71H”, “section 71I”, “section
71J”, “section 71K” and “section 71L” omitted
wherever occurring in relation to references to the Water Management Act 2000,
“section 71O”, “section 71P”, “section
71Q”, “section 71R”, “section 71S”,
“section 71T”, “section 71U”, “section
71V”, “section 71W”, “section 71Y” and
“section 71Z” inserted instead, respectively; “environmental
health water” and “supplementary environmental water”
omitted wherever occurring, “planned environmental water” inserted
instead. |