Reduce font size Increase font size

Blowering Dam Act 1951 No 24


NSW Crest

Status Information

Currency of version
Repealed version for 15 November 1976 to 27 June 2002 (accessed 21 May 2013 at 03:29).
Legislation on this site is usually updated within 3 working days after a change to the legislation.

Provisions in force
The provisions displayed in this version of the legislation have all commenced. See Historical notes

Note.
The Act was repealed by the Snowy Hydro Corporatisation Act 1997 No 99, sec 52 and Sch 2.1 with effect from 28.6.2002 (the corporatisation date under that Act).

Authorisation
This version of the legislation is compiled and maintained in a database of legislation by the Parliamentary Counsel's Office and published on the NSW legislation website, and is certified as the form of that legislation that is correct under section 45C of the Interpretation Act 1987.

File last modified 28 June 2002.

Contents

Long title

1 Name of Act
2 Work sanctioned
3 (Repealed)
4 Estimated cost
5 Amendment of Act No 45, 1912

Schedule

Historical notes


NSW Crest

An Act to sanction and to provide for the construction of a dam across the Tumut River at Blowering and works incidental thereto; to amend the Public Works Act 1912 in certain respects; and for purposes connected therewith.

1   Name of Act

This Act may be cited as the Blowering Dam Act 1951.

2   Work sanctioned

(1) 
(a)  The carrying out of the work described in the Schedule to this Act is hereby sanctioned.
(b)  The said work shall be deemed to be an authorised work within the meaning of the Public Works Act 1912, as amended by subsequent Acts.
(c)  The Water Conservation and Irrigation Commission is empowered to carry out the said work, and shall be the Constructing Authority for the same within the meaning of the said Act, as so amended, and shall enter into such contracts and take all such necessary steps for the proper execution thereof as such Authority may think proper.
(d)  The provisions of the Public Works Act 1912, as amended by subsequent Acts, sections thirty-four, thirty-five, thirty-six and thirty-seven excepted, shall apply to and in respect of the said work.
(2)  Without prejudice to the generality of subsection one of this section the provisions of section thirty-eight of the Public Works Act 1912, as amended by subsequent Acts, shall apply to and in respect of any contracts referred to in paragraph (c) of subsection one of this section.

3   (Repealed)

4   Estimated cost

The cost of carrying out the said work is estimated at forty-six million dollars and such estimated cost shall not, under any circumstances, be exceeded by more than ten per centum.

5   Amendment of Act No 45, 1912

For the purposes of this Act, but not otherwise, the following amendments shall be made in the Public Works Act 1912, that is to say:
(a)  section ninety-eight is amended by inserting in subsection three before the words “public works” the words “authorised works or”.
(b)  (Repealed)

Schedule

(Section 2)

(1)   

(a)  A dam across the Tumut River at Blowering about 11 miles upstream from the town of Tumut of a height sufficient to store about 1,300,000 acre feet of water, together with incidental works associated therewith.
(b)  A spillway and outlet works, together with incidental works associated therewith.
(c)  Re-location of existing roads, together with structures incidental thereto, and re-location or re-establishment of other existing services, including telephone lines and transmission lines.
(d)  Silt dams and weirs on the Tumut River and tributaries upstream of the storage to prevent siltation within the reservoir, and works necessary for the protection of the foreshores of the storage, if field investigations show these dams, weirs and works to be necessary and if they are carried out within the period referred to in clause 11 of the Schedule to the Blowering Dam (Snowy Mountains Hydro-electric Authority) Act 1963.
(e)  Establishment of borrow areas for soil and gravel and quarries for rock and aggregates.
(f)  Construction of access and works roads together with structures incidental thereto.

(2)   The whole of the work described in this Schedule to be subject to such modifications as may be deemed desirable by the Constructing Authority.

Historical notes

The following abbreviations are used in the Historical notes:

Am

amended

LW

legislation website

Sch

Schedule

Cl

clause

No

number

Schs

Schedules

Cll

clauses

p

page

Sec

section

Div

Division

pp

pages

Secs

sections

Divs

Divisions

Reg

Regulation

Subdiv

Subdivision

GG

Government Gazette

Regs

Regulations

Subdivs

Subdivisions

Ins

inserted

Rep

repealed

Subst

substituted

Table of amending instruments

Blowering Dam Act 1951 No 24. Assented to 29.10.1951. This Act has been amended as follows:

1963

No 54

Blowering Dam (Snowy Mountains Hydro-electric Authority) Act 1963. Assented to 19.12.1963.

1965

No 33

Decimal Currency Act 1965. Assented to 20.12.1965.
Date of commencement of sec 4, 14.2.1966, secs 1 (3), 2 (1) and the Currency Act 1965 (Commonwealth), sec 2 (2).

1976

No 66

Public Works and Other Acts (Interest Rates) Amendment Act 1976. Assented to 15.11.1976.
Date of commencement, 18.12.1975, sec 2.

Table of amendments

No reference is made to certain amendments made by the Decimal Currency Act 1965.

Sec 3

Rep 1963 No 54, sec 5 (a).

Sec 4

Am 1963 No 54, sec 5 (b).

Sec 5

Am 1976 No 66, Sch 1.

Sch

Subst 1963 No 54, sec 5 (c).

Top of page